What Your Leasing Pipeline Should Tell You.
A leasing pipeline should show more than how many enquiries a property has received. By tracking movement from enquiry through to a signed lease, PMs can identify where interest is dropping away, where delays are occurring and which properties need a different leasing strategy.
A property may be receiving plenty of enquiries but still remain vacant.
Another may attract strong inspection numbers but very few applications.
A third may receive several applications that never progress to approval.
Each property has a different problem and may require a different response.
A good leasing pipeline helps the PM identify exactly where the campaign is getting stuck.
The six stages of a leasing pipeline.
A simple leasing pipeline should track movement through six key stages:
Enquired: The prospective renter has expressed interest in the property.
Registered: They have registered for an inspection.
Inspected: They have attended an inspection.
Applied: They have submitted an application.
Approved: Their application has been approved.
Leased: The tenancy agreement has been finalised.
The value is not simply knowing how many people are at each stage.
It is understanding how successfully people are moving from one stage to the next.
Look beyond the total enquiry numbers.
Consider two properties advertised over the same period.
Leasing Stage | Property A | Property B |
|---|---|---|
Enquiries | 40 | 18 |
Registered | 24 | 12 |
Inspected | 16 | 9 |
Applied | 1 | 4 |
Approved | 0 | 1 |
Leased | 0 | 1 |
Property A attracted considerably more interest but failed to convert that interest into applications.
Property B received fewer enquiries but achieved a successful leasing outcome.
Without pipeline visibility, Property A might initially appear to be performing better.
Enquired but not registered.
If a property is receiving enquiries but few inspection registrations, investigate:
whether inspection times are suitable
how quickly enquiries are answered
whether registration instructions are clear
whether the registration process is too complicated
whether important property information is missing
Before recommending a change in asking rent, make sure the enquiry process itself is not contributing to the problem.
Registered but not inspected.
Strong registration numbers followed by poor attendance may indicate:
unsuitable inspection times
ineffective reminders
inconvenient inspection arrangements
changes in renter circumstances
competing properties being leased sooner
Review attendance patterns across several inspections.
If poor attendance is occurring across multiple properties, there may be a broader issue with the agency's inspection process.
Inspected but not applied.
This is often one of the most revealing stages of the pipeline.
Renters have shown enough interest to attend but have decided not to proceed.
Possible reasons include:
asking rent
property condition
poor presentation
differences between the advertising and the actual property
better competing properties
outstanding maintenance
unanswered questions
a difficult application process
Inspection feedback becomes particularly valuable at this point.
The PM needs to understand what is preventing interest from becoming applications.
Applied but not approved.
When applications are being received but few are progressing, review the assessment process.
Consider:
incomplete applications
outstanding documentation
reference delays
processing timeframes
landlord decision delays
applicants withdrawing
whether assessment requirements are clear, lawful and consistently applied
The aim is not to approve more applications simply to improve conversion figures.
It is to identify unnecessary delays or administrative barriers while maintaining appropriate application assessment standards.
Approved but not leased.
An approved application does not guarantee a completed tenancy.
Applicants may withdraw because:
another property has become available
communication has been slow
the commencement date does not suit
tenancy arrangements have changed
there are unresolved questions
finalising the agreement is taking too long
Monitor the time between approval and the tenancy agreement being finalised.
Delays at this stage can undo much of the work already completed.
Measure conversion between stages.
Conversion rates help identify where the biggest drop-off is occurring.
Conversion Measure | Calculation |
|---|---|
Enquiry to registration | Registrations ÷ enquiries × 100 |
Registration to attendance | Attendees ÷ registrations × 100 |
Inspection to application | Applicants who inspected ÷ attendees × 100 |
Application to approval | Approved applications ÷ applications × 100 |
Use consistent reporting periods and count unique prospective renters where appropriate. Some renters may also apply without inspecting, so allow for people who skip stages.
There is no universal conversion rate that every PM department should achieve.
Build your own benchmarks using previous leasing campaigns, similar properties and local market conditions.
Measure time as well as conversion.
A pipeline should also show how long people and applications spend at each stage.
Useful measures include:
time from enquiry to response
time from enquiry to inspection
time from inspection to application
time taken to process applications
time waiting for landlord decisions
time from approval to lease finalisation
A pipeline may have healthy conversion rates but still be moving too slowly.
That can extend vacancy periods and create unnecessary follow-up.
Look at individual properties and the whole portfolio.
Reviewing the pipeline for one property can help identify a problem with that particular leasing campaign.
Reviewing the pipeline across the department can identify wider problems.
For example:
One property has poor inspection-to-application conversion. Review its price, presentation and competition.
Most properties have poor registration-to-attendance conversion. Review the inspection process.
Applications are regularly taking too long to progress. Review the assessment workflow.
Approved applicants frequently withdraw. Review communication and lease finalisation.
This distinction helps determine whether you have a property problem, a market problem or an internal process problem.
Use the CRM to make the pipeline visible.
A PM-focused CRM should connect enquiry, registration, attendance, feedback and application activity wherever possible.
The team should not need to manually count emails, search through inspection records and build spreadsheets to understand how a property is performing.
The information should be readily available for:
daily leasing reviews
landlord updates
team meetings
campaign assessments
identifying outstanding follow-up
reviewing department performance
Practical Leasing Pipeline Review.
Use these questions when reviewing a property that is taking longer than expected to lease.
Which stage has the biggest drop-off?
Is movement between stages taking too long?
Are there outstanding questions or follow-up tasks?
What does the inspection feedback suggest?
How does the property compare with current competition?
Is the problem specific to this property or occurring across the portfolio?
What action should we take?
When will we review the results?
A pipeline should lead to better decisions.
The purpose of a leasing pipeline is not to produce another report.
It is to help the PM understand why a property remains vacant and what can be done about it.
Before arranging another inspection, recommending a rent reduction or changing the advertising, look at where people are dropping out of the process.
Understanding where the problem occurs makes it much easier to decide what needs to change.
