Major repairs need more than a work order and a quote. They usually require clearer planning, stronger communication, firm responsibility and closer follow-up so cost, access, disruption and risk are properly managed.

Major repairs are different from routine maintenance.

There may be:

  • several contractors

  • larger quotes

  • access over multiple days

  • renter disruption

  • safety issues

  • insurance involvement

  • temporary repairs

  • landlord decisions

  • longer timeframes

The PM needs to manage the whole job, not just send the work order.

Filed Under

Define the problem properly.

Before obtaining quotes, make sure the issue is understood.

Ask:

  • What has happened?

  • What caused it?

  • Is the cause confirmed?

  • Is further investigation needed?

  • Is the property safe?

  • Is temporary work required?

  • Is further damage likely?

A major repair should not start with an unclear scope.

Separate urgent work from permanent work.

Sometimes the first priority is simply to stop the situation getting worse.

For example:

  • isolate water

  • secure the property

  • make an electrical issue safe

  • arrange temporary roofing

  • remove an immediate hazard

The permanent repair can then be properly investigated and quoted.

Do not confuse emergency action with the final solution.

Get a clear scope of works.

Large repairs become difficult when different contractors are quoting on different things.

The scope should make clear:

  • what needs to be repaired

  • what needs to be replaced

  • what preparation work is required

  • whether another trade is involved

  • whether making good is included

  • what is excluded

  • expected timeframe

Without a clear scope, comparing quotes becomes difficult.

Decide whether multiple quotes are needed.

For major work, more than one quote may be sensible.

But make sure they are comparable.

A cheaper quote may exclude:

  • removal of damaged material

  • painting

  • disposal

  • access equipment

  • electrical work

  • making good

Price alone does not tell you which quote is better.

Compare the whole job.

Give the landlord a recommendation.

Do not simply forward three quotes.

Summarise:

  • what each contractor is proposing

  • important differences

  • likely timeframe

  • risks

  • your recommendation

For example:

Contractor A is $900 higher but includes the electrical work and making good. Contractor B excludes both. Based on the scope, we recommend Contractor A because it provides a more complete repair.

That is much easier for the landlord to assess.

Check whether insurance may be involved.

Where the damage may relate to an insurance claim, clarify that early.

The landlord may need to contact their insurer before permanent work starts.

There may also be requirements around:

  • photographs

  • reports

  • quotes

  • preserving evidence

  • approval before work

  • damaged materials

Do not assume the claim will be accepted.

The insurer determines cover.

Plan around the renter.

Major work can significantly affect the renter.

Think about:

  • access

  • noise

  • dust

  • water or power interruptions

  • rooms that cannot be used

  • pets

  • security

  • contractor attendance

  • likely duration

Give the renter realistic information.

Avoid promising a completion date unless it has been confirmed.

Make responsibility clear.

With larger repairs, responsibility can become blurred.

Be clear about:

  • who is coordinating the contractors

  • who approves variations

  • who updates the landlord

  • who updates the renter

  • who checks progress

  • who confirms completion

If several people assume someone else is managing the job, delays follow quickly.

Manage variations carefully.

Large jobs often uncover additional work.

Do not let contractors simply continue beyond the approved scope without clear authority where approval is required.

When a variation arises, confirm:

  • what has changed

  • why it is needed

  • additional cost

  • impact on timeframe

  • whether the work can wait

Then obtain the appropriate approval.

Keep a running job summary.

Major repairs can generate a lot of communication.

Keep a simple summary showing:

  • issue

  • contractor

  • approved scope

  • approved amount

  • work completed

  • variations

  • outstanding items

  • next action

  • next update date

This makes the job much easier to manage and hand over.

Watch the timeframe.

A major repair can quietly drift.

Set review points.

Ask:

  • Has work started?

  • Are materials available?

  • Are contractors attending as promised?

  • Has the completion date changed?

  • Is the renter being kept informed?

  • Is another decision holding up the job?

Do not wait for the landlord or renter to chase for an update.

Check legislative obligations.

Major repairs may involve urgent repair provisions, safety requirements, minimum rental standards or other obligations.

These differ across Australia.

Check the current legislation and official guidance for the relevant state or territory, particularly where the repair affects safety, essential services or whether the property can reasonably be occupied.

Inspect or verify completion.

Do not close a major repair simply because the final invoice arrives.

Confirm:

  • the approved work was completed

  • any variations were completed

  • the original issue is resolved

  • making good is finished

  • rubbish or materials are removed

  • the renter has been updated

  • further work is not required

For larger jobs, photographs or a final inspection may be appropriate.

Close the job properly.

Before closing the file, make sure you have:

  • final invoices

  • contractor reports where required

  • completion photos

  • warranties where applicable

  • landlord confirmation where needed

  • updated property records

  • any future maintenance recommendations

A major repair should leave a clear record of what was done.

Major repairs need active management.

The bigger the repair, the less suitable a simple:

Quote approved. Please proceed.

becomes.

Major repairs need someone watching:

scope

cost

timing

communication

risk

completion

The PM does not need to become the builder or project manager.

But someone still needs to keep the job moving from problem to completion.