Managing Major Repairs.
Major repairs need more than a work order and a quote. They usually require clearer planning, stronger communication, firm responsibility and closer follow-up so cost, access, disruption and risk are properly managed.
Major repairs are different from routine maintenance.
There may be:
several contractors
larger quotes
access over multiple days
renter disruption
safety issues
insurance involvement
temporary repairs
landlord decisions
longer timeframes
The PM needs to manage the whole job, not just send the work order.
Define the problem properly.
Before obtaining quotes, make sure the issue is understood.
Ask:
What has happened?
What caused it?
Is the cause confirmed?
Is further investigation needed?
Is the property safe?
Is temporary work required?
Is further damage likely?
A major repair should not start with an unclear scope.
Separate urgent work from permanent work.
Sometimes the first priority is simply to stop the situation getting worse.
For example:
isolate water
secure the property
make an electrical issue safe
arrange temporary roofing
remove an immediate hazard
The permanent repair can then be properly investigated and quoted.
Do not confuse emergency action with the final solution.
Get a clear scope of works.
Large repairs become difficult when different contractors are quoting on different things.
The scope should make clear:
what needs to be repaired
what needs to be replaced
what preparation work is required
whether another trade is involved
whether making good is included
what is excluded
expected timeframe
Without a clear scope, comparing quotes becomes difficult.
Decide whether multiple quotes are needed.
For major work, more than one quote may be sensible.
But make sure they are comparable.
A cheaper quote may exclude:
removal of damaged material
painting
disposal
access equipment
electrical work
making good
Price alone does not tell you which quote is better.
Compare the whole job.
Give the landlord a recommendation.
Do not simply forward three quotes.
Summarise:
what each contractor is proposing
important differences
likely timeframe
risks
your recommendation
For example:
Contractor A is $900 higher but includes the electrical work and making good. Contractor B excludes both. Based on the scope, we recommend Contractor A because it provides a more complete repair.
That is much easier for the landlord to assess.
Check whether insurance may be involved.
Where the damage may relate to an insurance claim, clarify that early.
The landlord may need to contact their insurer before permanent work starts.
There may also be requirements around:
photographs
reports
quotes
preserving evidence
approval before work
damaged materials
Do not assume the claim will be accepted.
The insurer determines cover.
Plan around the renter.
Major work can significantly affect the renter.
Think about:
access
noise
dust
water or power interruptions
rooms that cannot be used
pets
security
contractor attendance
likely duration
Give the renter realistic information.
Avoid promising a completion date unless it has been confirmed.
Make responsibility clear.
With larger repairs, responsibility can become blurred.
Be clear about:
who is coordinating the contractors
who approves variations
who updates the landlord
who updates the renter
who checks progress
who confirms completion
If several people assume someone else is managing the job, delays follow quickly.
Manage variations carefully.
Large jobs often uncover additional work.
Do not let contractors simply continue beyond the approved scope without clear authority where approval is required.
When a variation arises, confirm:
what has changed
why it is needed
additional cost
impact on timeframe
whether the work can wait
Then obtain the appropriate approval.
Keep a running job summary.
Major repairs can generate a lot of communication.
Keep a simple summary showing:
issue
contractor
approved scope
approved amount
work completed
variations
outstanding items
next action
next update date
This makes the job much easier to manage and hand over.
Watch the timeframe.
A major repair can quietly drift.
Set review points.
Ask:
Has work started?
Are materials available?
Are contractors attending as promised?
Has the completion date changed?
Is the renter being kept informed?
Is another decision holding up the job?
Do not wait for the landlord or renter to chase for an update.
Check legislative obligations.
Major repairs may involve urgent repair provisions, safety requirements, minimum rental standards or other obligations.
These differ across Australia.
Check the current legislation and official guidance for the relevant state or territory, particularly where the repair affects safety, essential services or whether the property can reasonably be occupied.
Inspect or verify completion.
Do not close a major repair simply because the final invoice arrives.
Confirm:
the approved work was completed
any variations were completed
the original issue is resolved
making good is finished
rubbish or materials are removed
the renter has been updated
further work is not required
For larger jobs, photographs or a final inspection may be appropriate.
Close the job properly.
Before closing the file, make sure you have:
final invoices
contractor reports where required
completion photos
warranties where applicable
landlord confirmation where needed
updated property records
any future maintenance recommendations
A major repair should leave a clear record of what was done.
Major repairs need active management.
The bigger the repair, the less suitable a simple:
Quote approved. Please proceed.
becomes.
Major repairs need someone watching:
scope
cost
timing
communication
risk
completion
The PM does not need to become the builder or project manager.
But someone still needs to keep the job moving from problem to completion.