AgentCentre Education

Maintenance Risk Assessment Checklist.

Use this when a maintenance issue looks minor but may carry a bigger risk if it is delayed.

Filed Under

Immediate Risk.

  • Is anyone’s safety affected?

  • Is there active water, electrical or structural risk?

  • Is the property secure?

  • Is an essential service affected?

  • Is any part of the property unusable?

Risk of Further Damage.

  • Could the problem worsen if left?

  • Could another part of the property be damaged?

  • Is moisture, leaking or water ingress involved?

  • Could the repair cost increase if delayed?

  • Has the issue already become worse?

History.

  • Has this happened before?

  • Has the same item been repaired previously?

  • Is there a pattern of repeat reports?

  • Has a contractor previously warned about the issue?

  • Is the item ageing or near the end of its useful life?

Renter Impact.

  • Is the renter being significantly inconvenienced?

  • Is the issue affecting normal use of the property?

  • Has the renter reported the problem more than once?

  • Is the issue causing ongoing disruption?

Contractor Advice.

  • Has a contractor inspected the issue?

  • Is the cause known?

  • Is the current repair only temporary?

  • Has further investigation been recommended?

  • Has replacement been suggested instead of another repair?

Landlord Decision.

  • Has the landlord been given enough information?

  • Has the risk of delay been explained?

  • Has a clear recommendation been provided?

  • Are alternative options available?

  • Is approval still outstanding?

Legal and Compliance Check.

  • Could urgent repair rules apply?

  • Could minimum rental standards apply?

  • Is there a safety or security obligation?

  • Does current state or territory legislation need to be checked?

  • Does the issue require senior review?

Overall Risk Rating.

Low Risk
Issue is stable, impact is limited and delay is unlikely to make the problem worse.

Medium Risk
Issue needs active follow-up because delay may increase cost, disruption or property damage.

High Risk
Issue involves safety, serious deterioration, essential services, legal obligations or a strong likelihood of further damage.

Risk Rating:
Low / Medium / High

Recommended Action:


Responsible Person:


Follow-Up Date:


Before leaving the job open, ask:

What is likely to happen if we do nothing for the next seven days?

If the answer creates a larger problem, the job probably needs a higher priority.

Back to Education Library